The practice designs, builds and supervises marine and coastal works across the Maldives — as contractor, or as the owner's engineer. Jetties, coastal protection, dredging and reclamation, moorings and navigation, coral plantation and reef restoration — from design package to as-built.

What this practice does

Barlovento Marine Works provides marine structures design, coastal protection, capital and maintenance dredging, reclamation and beach nourishment, marine construction, moorings and navigation, coral plantation and reef restoration, and owner's engineer and construction supervision services in the Maldives, acting either as contractor or as independent engineer on a given project.

Services

What the practice delivers.

03.1

Marine structures

Design of jetties, quays, pontoons, overwater foundations and seaplane platforms, with condition assessment and repair design for structures already in service.

SCOPE  Jetties, quays and pontoons · Overwater villa foundations · Seaplane platforms · Condition assessment · Repair and strengthening design
Typical section of an anchored sheet-pile quay wall with capping beam, tie rod and anchor pile
Fig. 5 — Anchored sheet-pile quay wall, typical section: harbour and service-jetty structure with dredged basin.
Groyne plan and rubble-mound cross sections
Fig. 6 — Groyne plan and rubble-mound sections from the same package.
03.2

Coastal protection & shoreline management

Erosion assessment and the design of breakwaters, revetments, groynes and sand bypassing, with shoreline monitoring and nourishment support for islands that move with the monsoon.

SCOPE  Erosion assessment · Breakwaters, revetments and groynes · Shoreline monitoring · Nourishment design and support
Coastal modification scheme drawing: reclamation footprint, groyne field, headland breakwaters and nourishment cells
Fig. 3 — Coastal modification scheme for a resort island, from a Barlovento-coordinated design package: reclamation footprint, groyne field, headland breakwaters and nourishment cells set against the reef edge (scheme anonymised).
03.3

Dredging & reclamation

Capital and maintenance dredging, reclamation and beach nourishment executed as contractor with sediment and turbidity controls — or specified, method-reviewed and supervised for clients who procure the works elsewhere.

SCOPE  Capital and maintenance dredging · Lagoon and channel dredging · Reclamation and nourishment · Turbidity and sediment control · Specifications and method review
Typical section of a reclamation bund with rock armour on geotextile over a design dredge line
Fig. 4 — Reclamation bund and armoured revetment, typical section from an issued construction package: the containment that lets hydraulic fill be placed to a surveyed profile.
03.4

Marine construction works

Direct execution of jetty and pontoon construction, repairs, mooring and navigation-aid installation and minor coastal works, supported by method statements and QA/QC records.

SCOPE  Jetty and pontoon construction · Marine repairs · Mooring and aid-to-navigation installation · Minor coastal works · Method statements and QA/QC
03.5

Moorings & navigation

Mooring design and anchorage planning for resort fleets, liveaboards and offshore instrumentation; channel marking, aids to navigation and navigation risk reviews.

SCOPE  Mooring design · Anchorage planning · Channel marking and aids to navigation · Navigation risk reviews · Sub-surface instrumentation moorings
03.6

Owner's engineer & construction supervision

Design review, tender preparation and evaluation, construction supervision, progress certification and handover — on projects where Barlovento is not the contractor.

SCOPE  Design review · Tender preparation and evaluation · Construction supervision · Progress certification · Handover and as-builts
03.7

Coral plantation & reef restoration

Coral plantation programmes for resorts and for the mitigation conditions of dredging and reclamation permits: coral relocation ahead of works, nursery frames and transplantation onto reef flats, revetments and breakwaters, and the monitoring that an EIA decision or a sustainability report requires — carried out under the permits the Environmental Protection Agency requires for coral collection and relocation.

SCOPE  Coral relocation ahead of dredging and reclamation · Nursery frames and coral gardens · Transplantation onto reef, revetment and breakwater · Survival and growth monitoring · Reporting for EIA compliance and resort sustainability programmes
Reef survey transect photograph showing benthic composition
Fig. 2 — Reef survey transects: benthic composition and live-coral cover recorded as the environmental baseline for the EIA.
Reef survey transect photograph showing live coral colonies
Long-reach excavator working from a pontoon in a Maldivian lagoon
Long-reach excavator on pontoon · lagoon works
Landing craft with bow ramp lowered in shallow water
250 t landing craft · beach discharge
36-tonne tracked excavator on a coral sand site
CAT 336D · 36 t
Typical deliverables

Design packages · Drawings and specifications · Method statements · Tender documents · QA/QC records · Progress certificates · As-built documentation · Coral relocation and monitoring reports

Questions

Questions we are asked

Do you do coral plantation in the Maldives?

Yes. Coral plantation is part of the Marine Works practice: relocation of coral colonies out of a dredging or reclamation footprint before works start, nursery frames and transplantation onto reef flats, revetments and breakwaters, and survival monitoring. Collection and relocation of coral in the Maldives require authorisation from the Environmental Protection Agency; we work under those permits and report to the conditions of the EIA decision.

Do you dredge yourselves or manage a dredging contractor?

Both, on different projects. We execute capital and maintenance dredging, reclamation and nourishment as contractor, with the plant matched to the volume and the geology. On projects where the owner procures dredging elsewhere, we write the specification, review the method and supervise as owner's engineer. We do not do both on the same project.

What form of contract do you recommend for dredging and reclamation?

For dredging and reclamation specifically, the FIDIC Blue Book (Form of Contract for Dredging and Reclamation Works) is the international reference and is understood by every serious dredging contractor. The basis of measurement for payment — in-situ pre- and post-dredge survey versus hopper measurement — is the clause that decides most disputes and should be fixed early.

How do you design for coral substrate?

Coral sand and caprock behave unlike continental soils: variable density, cementation horizons, high permeability. Designs are based on site-specific geotechnical investigation and bathymetry, and construction methods are chosen from what can actually be mobilised in-country.

Work with the Marine Works practice.

From a single jetty to a full resort marine package — executed or supervised, never both.